600 MW Hybrid Solar-Wind-BESS Energy Platform infrastructure project
Back to projectsRenewable Energy

600 MW Hybrid Solar-Wind-BESS Energy Platform

Location
Lualaba and Haut-Katanga, DRC
Status
SPV incorporated; development and due diligence underway
Scale
600 MW hybrid renewable energy platform
Project Overview

Large-scale renewable energy platform combining solar photovoltaic generation, wind power, and BESS battery storage for strategic electricity demand in the DRC.

Strategic Importance

The project is designed to support the DRC's electricity access goals, strengthen industrial power reliability, and increase clean energy generation in provinces central to mining and industrial growth.

Investment Rationale

The platform combines large-scale renewable generation, storage, grid-connection planning, and potential industrial demand, making it relevant for infrastructure investors, EPC partners, DFIs, and strategic energy operators.

Open Call | 20 July 2026

Five professionals sought for the project monitoring committee.

Applications close 30 July 2026 at 3:30 PM (Kinshasa time).

View Opportunity
Project Milestones

Documented progress points.

June 2026

Government MOU signed

A government-level Memorandum of Understanding was signed in June 2026, establishing the collaboration framework for the 600 MW hybrid solar-wind-BESS platform in Lualaba and Haut-Katanga.

June 2026

International due diligence underway

An official due-diligence process covering international technical and financial partners is in progress in support of the platform.

June 2026

Dedicated project SPV incorporated

Africa Hybrid Power DRC SARL was incorporated as the project vehicle for the 600 MW platform.

20 July 2026

Monitoring committee recruitment initiated

AIDG issued a call for expressions of interest for five specialist profiles to be proposed for representation on the project's monitoring committee.

July 2026

Partner facility site visits conducted

AIDG leadership visited operating utility-scale solar and BESS battery storage facilities in Europe with technical partners, assessing deployed technology, installation practice, and delivery standards for the 600 MW platform.

AIDG leadership and technical partners during a site visit at a utility-scale solar and battery storage facility

Diligence is done in person, not on paper.

On the Ground

Technology verified at operating facilities.

In July 2026, AIDG leadership joined technical partners on site at operating utility-scale solar PV and containerized BESS battery storage installations in Europe. The visits covered deployed inverter and storage technology, grid connection equipment, and installation practice — the same delivery standards specified for the 600 MW platform.

Field verification of this kind sits at the core of the project’s ongoing international due-diligence process.

Development Pipeline

Current stage: Financing

1Concept
2Feasibility
3ESIA
4Land Acquisition
5Financing
6Construction
7Operations
Technical Information

Asset Facts

Capacity
500–600 MW target
Phased delivery
Phase I of 200–250 MW
Location
Lualaba and Haut-Katanga, DRC
Technology
Solar PV, wind power, and BESS battery storage
Project vehicle
Africa Hybrid Power DRC SARL, incorporated as the dedicated SPV
Strategic partners
SIA TESLA, Energofirma JAUDA, SIA Power Solution, HYGO X (Latvia)
Grid relevance
Associated energy evacuation, transmission, and connection infrastructure
Commercial focus
Power supply for industrial and strategic electricity demand
Investment Opportunity

Participation Pathway

Africa Hybrid Power DRC SARL has been incorporated as the dedicated SPV for the platform. The project is anchored by a government-level MOU signed in June 2026 and supported by international technical and financial partner due diligence. Detailed capital requirements are available upon request.

Investment briefInformation available upon request.
Technical noteInformation available upon request.
Financial model accessInformation available upon request.
Request Materials